Programme
Stated plainly, because serious counterparties check. The design is pre-certified and the architecture is in service. No hull has been built. Hull one is open to an anchor lessee.
Status
Sequence
Eight to twelve weeks. Converts a pre-certified historic design into a current, bankable engineering package. This is the gate to everything after it.
Scope the notation pathway for a hull intended for multi-application deployment, before the design is frozen.
Term-sheet level discussions with a prospective lessee in each of two different sectors, to test appetite for a leased host against building and owning one.
Two to three candidate yards with relevant fabrication experience. Indicative pricing for a first unit and for a repeat-build series.
Structure the build against a signed lease. Infrastructure funds and marine asset lessors scoped on appetite for holding residual risk in a standardised, redeployable hull.
Unit class certification proceeds through construction in the normal way.
What is needed
The application that funds hull one. Most plausibly a hyperscale compute operator or a government water authority — both have immediate, severe pressure and long-term offtake logic.
An eight to twelve week programme. Scope and budget are in the pack.
Box-girder and semisubmersible fabrication experience, with slot availability for a repeat series.
Engagement before design freeze on a notation approach that does not presuppose the topsides function.